Select project history

Feature Profiles
Southwest River Crossing
EPC services for the construction of caisson foundations as part of a new 90 km, 240-kV double-circuit transmission line connecting substations in Lethbridge, Alberta...

Keephills Substation
Constructed the foundations for a new 500 kV substation and a new 240 kV substation, which Valard also built...

Port Mann Project
Procured and installed direct embed poles and concrete foundations for large monopole transmission towers. Foundation shafts were massive at eight feet in diameter and 100 feet in depth. This work was needed to realign a transmission line to make way for the new Port Mann Bridge in British Columbia...
