Firebag Project

Construct foundations and earthworks for five 144 kV / 260 kV substations including transformer oil containment pits. Also part of this project was an 18-km 144-kV transmission line, which Valard also built.

Client: Suncor Energy
Location: Fort McMurray, AB
Dates:  2009

 

Get Adobe Flash player Install latest flash player if you can't see this gallery, or click here to see the html version.

Kearl Oil Sands Project

Provided supervision and construction of monopole foundations set on screw piles. Over 70 caps ranging in different sizes were installed. Some of the largest caps were 45 feet square and 7 feet high.

Client: Fluor
Location: Fort McMurray, Alberta
Dates:  September 2009 to January 2010

Cypress Interconnect

Constructed foundations for transmission lines connecting a substation to the grid. Drilled caissons ranged from four-feet diameter to eight-feet diameter and reached 40 feet down. Mitigation measures had to be taken to preserve a hawk nest along the right of way. Busy roadways near the work site also proved challenging, but the project was completed successfully on time, on budget and without incident.

Client: SaskPower
Location: West of Burstall, Saskatchewan

North Central Project

Constructed and installed foundations and micro-pile anchors as part of a new 79-km, 230-kV lattice single circuit transmission line, which Valard also built. All work was completed from Valard camps in extremely remote conditions in northern Manitoba.

Client: Manitoba Hydro
Location: North Central Region, Manitoba
Dates: 1996