Kearl Oil Sands Project
Provided supervision and construction of monopole foundations set on screw piles. Over 70 caps ranging in different sizes were installed. Some of the largest caps were 45 feet square and 7 feet high.
Client: Fluor
Location: Fort McMurray, Alberta
Dates: September 2009 to January 2010
Cypress Interconnect
Constructed foundations for transmission lines connecting a substation to the grid. Drilled caissons ranged from four-feet diameter to eight-feet diameter and reached 40 feet down. Mitigation measures had to be taken to preserve a hawk nest along the right of way. Busy roadways near the work site also proved challenging, but the project was completed successfully on time, on budget and without incident.
Client: SaskPower
Location: West of Burstall, Saskatchewan
North Central Project
Constructed and installed foundations and micro-pile anchors as part of a new 79-km, 230-kV lattice single circuit transmission line, which Valard also built. All work was completed from Valard camps in extremely remote conditions in northern Manitoba.
Client: Manitoba Hydro
Location: North Central Region, Manitoba
Dates: 1996