Electric Power

Dokie Wind Farm

Procurement & Construction

This project was logistically challenging, as most structures had to be placed in rock excavations.

We procured and constructed the collector system for a new wind farm, consisting of 30 km of 35 kV overhead lines and 7 km of 230 kV grid connection (braced post). Yet another project completed on budget, on time and without incident!

Client

Earthfirst

Start Date

January 2009

End Date

December 2009

Highlights
  • Structures placed in rock excavations
  • 30 km of 35 kV overhead lines
  • 7 km of 230 kV grid connection