/ 230 kV to 115 kV Project

  • Rockwood Transmission Station consists of 230 kV and 115 kV switch yards including a single 285 MVA auto-transformer bank and automated control building.
  • Rockwood was the 1st EPC station project awarded by Manitoba Hydro.
  • The project comprised of engineering, procurement, construction and commissioning (EPCC).
  • The entire station was constructed on rock socketed cast-in-place concrete caissons.
  • Valard was responsible for procuring all materials, equipment and HV electrical apparatus for the station.
Back to Project List

/ Client

Manitoba Hydro

/ Start Date

Jan
2013

/ End Date

Sep
2015